S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
117. The holder of the authorization must draw up a daily report of the work and keep it on the activity site.
The daily report must contain all the elements applicable to the declared day including, in particular,
(1)  the number of the stratigraphic survey authorization;
(2)  a description, in chronological order, of the work carried out and the time required for completing each step of the work;
(3)  the name of the enterprises that carried out the work;
(4)  the measured depth reached during the day;
(5)  the composition of the drilling fluid and spacer fluid, and the volumes used;
(6)  the operating condition of the blowout prevention system;
(7)  a loss of circulation;
(8)  the components used to assemble the strings;
(9)  the specifications of the casing and its setting depth;
(10)  the weight applied to the bit and its penetration rate;
(11)  the measurements of the deviation of the stratigraphic survey path in dip, azimuth and depth;
(12)  traces of petroleum or water detected;
(13)  the type of pump used and its capacity;
(14)  the type of cement used, its density, its additives and their proportions, its setting time and the volume used;
(15)  the well logs carried out;
(16)  the observations and data related to the evaluation or characterization of the geological formation;
(17)  the fluid samples collected;
(18)  the results of the pressure and leak tests;
(19)  the volume and composition of the gas used, released, incinerated or burnt at the flare;
(20)  the composition, concentration and detailed assessment of all the products identified in the technical program that are stored or used on the activity site;
(21)  the operational problems encountered and the corrective measures taken or planned;
(22)  the indication of any temporary work interruption and the procedure followed to secure the stratigraphic survey;
(23)  the indication of any event that disrupted the progress of the work; and
(24)  any other information or document deemed necessary by the Minister.
O.C. 1252-2018, s. 117.
In force: 2018-09-20
117. The holder of the authorization must draw up a daily report of the work and keep it on the activity site.
The daily report must contain all the elements applicable to the declared day including, in particular,
(1)  the number of the stratigraphic survey authorization;
(2)  a description, in chronological order, of the work carried out and the time required for completing each step of the work;
(3)  the name of the enterprises that carried out the work;
(4)  the measured depth reached during the day;
(5)  the composition of the drilling fluid and spacer fluid, and the volumes used;
(6)  the operating condition of the blowout prevention system;
(7)  a loss of circulation;
(8)  the components used to assemble the strings;
(9)  the specifications of the casing and its setting depth;
(10)  the weight applied to the bit and its penetration rate;
(11)  the measurements of the deviation of the stratigraphic survey path in dip, azimuth and depth;
(12)  traces of petroleum or water detected;
(13)  the type of pump used and its capacity;
(14)  the type of cement used, its density, its additives and their proportions, its setting time and the volume used;
(15)  the well logs carried out;
(16)  the observations and data related to the evaluation or characterization of the geological formation;
(17)  the fluid samples collected;
(18)  the results of the pressure and leak tests;
(19)  the volume and composition of the gas used, released, incinerated or burnt at the flare;
(20)  the composition, concentration and detailed assessment of all the products identified in the technical program that are stored or used on the activity site;
(21)  the operational problems encountered and the corrective measures taken or planned;
(22)  the indication of any temporary work interruption and the procedure followed to secure the stratigraphic survey;
(23)  the indication of any event that disrupted the progress of the work; and
(24)  any other information or document deemed necessary by the Minister.
O.C. 1252-2018, s. 117.